Page Header

  • REVIEWERS
  • EDITORIAL TEAM
  • FOCUS AND SCOPE
  • PEER REVIEW PROCESS
  • PUBLICATION ETHICS
  • INDEXING
  • ONLINE REGISTRATION
  • AUTHOR'S GUIDE
  • AUTHOR FEE
  • OPEN ACCESS STATEMENT
  • CONTACT US
  • PLAGIARISM POLICY
  • ARCHIVE POLICY
  • COPYRIGHT AND LICENCE
  • MANUSCRIPT WITHDRAWAL
  • MANUSCRIPT SUBMISSION TUTORIAL
ISSN

e-ISSN : 2745-6110

Accredited by:

DESKRIPSI GAMBAR

Visitor Statistic

Flag Counter

Contact us :

Whatsapp

slot demo

togel123

Journal Help
User
Notifications
  • View
  • Subscribe
Open Journal Systems
Journal Content

Browse
  • By Issue
  • By Author
  • By Title
  • Other Journals
Font Size

Information
  • For Readers
  • For Authors
  • For Librarians
Keywords Batas-batas Atterberg Beton Break Event Point DEM SRTM, DAS, Morfometri, SIG, ArcGIS 10.3 Debit Rencana Distribusi Ukuran Butir Drainase Drainase, Banjir, Lubang resapan biopori Failure Load Kinerja Simpang, Tak Bersinyal, Volume Jam Puncak, Derajat Kejenuhan MKJI, Volume Jam Perencanaan, Google Maps, lalu lintas biasanya, waktu populer Net Present Value. Optimalisasi Paving Block. Kawat Bendrat. Uji Kuat Tekan PayBack Periode Redundancy Safety Faktor Sistem klasifikasi AASHTO Sistem klasifikasi Unified. Tiang Pancang transportasi.
  • Home
  • About
  • Login
  • Register
  • Search
  • Current
  • Archives
  • Announcements
Home > Archives > Vol 7, No 2 (2016)

Vol 7, No 2 (2016)

Oktober

DOI: http://dx.doi.org/10.36448/jts.v7i2

Table of Contents

Articles

Studi Kasus Kerusakan Jalan Struktur Ruas Jalan Terbanggi Besar – Bujung Tenuk Kabupaten Tulang Bawang
Hery Riyanto
PDF
Analisis Investasi Bangunan Ruko dengan Metode Break Event Point, Payback Periode, dan Net Present Value
Sugito SUGITO
PDF
Pengujian Pemadatan Campuran Beton Aspal
Lilies Widojoko
PDF
Optimasi Waktu Pelaksanaan Proyek Menggunakan Microsoft Project
Susilowati SUSILOWATI
PDF


https://larioja.ugt-sp.es/

https://alumni.mas.bg.ac.rs/